We have located links that may give you full text access.
Does Pre-Emptive Availability of PREDICT 2.1 Results Change Ordering Practices for Oncotype DX? A Multi-Center Prospective Cohort Study.
Current Oncology 2024 Februrary 28
For early-stage hormone receptor (HR)-positive and HER2-negative breast cancer, tools to estimate treatment benefit include free and publicly available algorithms (e.g., PREDICT 2.1) and expensive molecular assays (e.g., Oncotype DX). There remains a need to identify patients who de-rive the most benefit from molecular assays and where this test may be of poor value. In this multicenter prospective cohort study, we evaluated whether use of PREDICT 2.1 would impact physician decision making. For the first 6 months of the study, data on physician use of both PREDICT 2.1 and Oncotype DX ordering were collected on all newly diagnosed patients eligible for molecular testing. After 6 months, an educational intervention was undertaken to see if providing physicians with PREDICT 2.1 results affects the frequency of Oncotype DX requests. A total of 602 patients across six cancer centers in Ontario, Canada were recruited between March 2020 and November 2021. Providing PREDICT 2.1 results and an educational intervention did not alter the ordering of an Oncotype DX. For patients with low clinical risk, either by clinico-pathologic features or by PREDICT 2.1, the probability of obtaining a high Oncotype DX recurrence score was substantially lower compared to patients with high-clinical-risk disease. The introduction of an educational intervention had no impact on molecular assay requests. However, routine ordering of molecular assays for patients with low-clinical-risk disease is of poor value.
Full text links
Related Resources
Get seemless 1-tap access through your institution/university
For the best experience, use the Read mobile app
All material on this website is protected by copyright, Copyright © 1994-2024 by WebMD LLC.
This website also contains material copyrighted by 3rd parties.
By using this service, you agree to our terms of use and privacy policy.
Your Privacy Choices
You can now claim free CME credits for this literature searchClaim now
Get seemless 1-tap access through your institution/university
For the best experience, use the Read mobile app