We have located links that may give you full text access.
Impact of tunnelling on piles in Parisian subsoil: dataset of in-situ measurements in the ground and on three instrumented piles.
Data in Brief 2023 April
A major full-scale experiment (the TULIP - Tunneling and Limitations on the Impact on Piles - research project) was conducted in 2020 on Line 16 of the Grand Paris Express project (France). Its objective was to analyze the tunnel boring machine-soil-pile interactions occurring during tunnel excavation near piled structures in the context of the geology of the Paris basin. This data paper summarizes the main measurements made during this experiment, namely: (i) the horizontal and vertical displacements measured in the ground, on the surface and in the thickness of the cover, (ii) the settlements of the pile heads, and the variations of the normal forces in the pile depth. These data, interpreted in two articles cited in the references, may be of interest for the calibration of analytical and numerical models dedicated to the estimation of the impact of TBM excavation on neighboring constructions, in particular those based on piles.
Full text links
Related Resources
Get seemless 1-tap access through your institution/university
For the best experience, use the Read mobile app
All material on this website is protected by copyright, Copyright © 1994-2024 by WebMD LLC.
This website also contains material copyrighted by 3rd parties.
By using this service, you agree to our terms of use and privacy policy.
Your Privacy Choices
You can now claim free CME credits for this literature searchClaim now
Get seemless 1-tap access through your institution/university
For the best experience, use the Read mobile app