English Abstract
Journal Article
Add like
Add dislike
Add to saved papers

[Three-dimensional finite element analysis of cement flow in abutment margin-crown platform switching].

OBJECTIVE: To analyze the cement flow in the abutment margin-crown platform switching structure by using the three-dimensional finite element analysis, in order to prove that whether the abutment margin-crown platform switching structure can reduce the inflow depth of cement in the implantation adhesive retention.

METHODS: By using ANSYS 19.0 software, two models were created, including the one with regular margin and crown (Model one, the traditional group), and the other one with abutment margin-crown platform switching structure (Model two, the platform switching group). Both abutments of the two models were wrapped by gingiva, and the depth of the abutment margins was 1.5 mm submucosal. Two-way fluid structure coupling calculations were produced in two models by using ANSYS 19.0 software. In the two models, the same amount of cement were put between the inner side of the crowns and the abutments. The process of cementing the crown to the abutment was simulated when the crown was 0.6 mm above the abutment. The crown was falling at a constant speed in the whole process spending 0.1 s. Then we observed the cement flow outside the crowns at the time of 0.025 s, 0.05 s, 0.075 s, 0.1 s, and measured the depth of cement over the margins at the time of 0.1 s.

RESULTS: At the time of 0 s, 0.025 s, 0.05 s, the cements in the two models were all above the abutment margins. At the time of 0.075 s, in Model one, the gingiva was squeezed by the cement and became deformed, and then a gap was formed between the gingiva and the abutment into which the cement started to flow. In Model two, because of the narrow neck of the crown, the cement flowed out from the gingival as it was pressed by the upward counterforce from the gingival and the abutment margin. At the time of 0.1 s, in Model one, the cement continued to flow deep inside with the gravity force and pressure, and the depth of the cement over the margin was 1 mm. In Model two, the cement continued to flow out from the gingival at the time of 0.075 s, and the depth of the cement over the margin was 0 mm.

CONCLUSION: When the abutment was wrapped by the gingiva, the inflow depth of cement in the implantation adhesive retention can be reduced in the abutment margin-crown platform switching structure.

Full text links

We have located links that may give you full text access.
Can't access the paper?
Try logging in through your university/institutional subscription. For a smoother one-click institutional access experience, please use our mobile app.

Related Resources

For the best experience, use the Read mobile app

Mobile app image

Get seemless 1-tap access through your institution/university

For the best experience, use the Read mobile app

All material on this website is protected by copyright, Copyright © 1994-2024 by WebMD LLC.
This website also contains material copyrighted by 3rd parties.

By using this service, you agree to our terms of use and privacy policy.

Your Privacy Choices Toggle icon

You can now claim free CME credits for this literature searchClaim now

Get seemless 1-tap access through your institution/university

For the best experience, use the Read mobile app