Journal Article
Research Support, Non-U.S. Gov't
Add like
Add dislike
Add to saved papers

MINErosion 3: Using measurements on a tilting flume-rainfall simulator facility to predict erosion rates from post-mining landscapes in Central Queensland, Australia.

Open-cut coal mining in Queensland results in the formation of extensive saline overburden spoil-piles with steep slopes at the angle of repose (approximately 75% or 37o). These spoil-piles are generally found in multiple rows, several kilometers in length and heights of up to 50 or 60 m above the original landscape. They are highly dispersive and erodible. Legislation demands that these spoil piles be rehabilitated to minimize on-site and off-site discharges of sediment and salt into the surrounding environment. To achieve this, the steep slopes must be reduced, stabilized against erosion, covered with topsoil and re-vegetated. Key design criteria (slope gradient, slope length and vegetation cover) are required for the construction of post-mining landscapes that will result in acceptable erosion rates. A novel user-friendly hillslope computer model MINErosion 3.4 was developed that can accurately predict potential erosion rates from field scale hillslopes using parameters measured with a 3m laboratory tilting flume-rainfall simulator or using routinely measured soil physical and chemical properties. This model links MINErosion 2 with a novel consolidation and above ground vegetation cover factors, to the RUSLE and MUSLE equations to predict the mean annual and storm event erosion rates. The RUSLE-based prediction of the mean annual erosion rates allow minesites to derive the key design criteria of slope length, slope gradient and vegetation cover that would lead to acceptable erosion rates. The MUSLE-based prediction of storm event erosion rates will be useful as input into risk analysis of potential damage from erosion. MINErosion 3.4 was validated against erosion measured on 20 m field erosion plots established on post-mining landscapes at the Oakey Creek and Curragh coalmines, as well as on 120 and 70 m erosion plots on postmining landscapes at Kidston Gold Mine.

Full text links

We have located links that may give you full text access.
Can't access the paper?
Try logging in through your university/institutional subscription. For a smoother one-click institutional access experience, please use our mobile app.

Related Resources

For the best experience, use the Read mobile app

Mobile app image

Get seemless 1-tap access through your institution/university

For the best experience, use the Read mobile app

All material on this website is protected by copyright, Copyright © 1994-2024 by WebMD LLC.
This website also contains material copyrighted by 3rd parties.

By using this service, you agree to our terms of use and privacy policy.

Your Privacy Choices Toggle icon

You can now claim free CME credits for this literature searchClaim now

Get seemless 1-tap access through your institution/university

For the best experience, use the Read mobile app