We have located links that may give you full text access.
Cryopump development of the 5 MW neutral beam injector system on HL-2M tokamak.
Review of Scientific Instruments 2017 July
In order to carry out the long pulse and high power neutral beam injector (NBI) heating experiment on the HL-2M tokamak and satisfy its high vacuum pumping speed in the NBI, two built-in cryopumps with large area and based on a three-stage adsorption structure have been developed. The design idea and size of the three stage structure, the manufacturing technique, and the test experiment for cryopumps have been described in this paper. The experimental result shows that the cooldown time of liquid nitrogen pipes and liquid helium pipes are 1.5 h and 10 min, respectively. With activated charcoal bonded on the condensation plates, the pumping speed reaches 1.13 × 106 l/s, and the consumption of liquid helium is 2.53 g/s and 3.11 g/s for the 4-component pump and the 5-component pump, respectively. The conductance probability of the pump inlet is 0.25 for hydrogen.
Full text links
Related Resources
Get seemless 1-tap access through your institution/university
For the best experience, use the Read mobile app
All material on this website is protected by copyright, Copyright © 1994-2024 by WebMD LLC.
This website also contains material copyrighted by 3rd parties.
By using this service, you agree to our terms of use and privacy policy.
Your Privacy Choices
You can now claim free CME credits for this literature searchClaim now
Get seemless 1-tap access through your institution/university
For the best experience, use the Read mobile app