Add like
Add dislike
Add to saved papers

Operationalisation of service quality in household waste collection.

Waste Management 2017 April
Since 2007, there has been intensive discussion at European and national levels concerning the standardisation of services including those in the sector of waste management. The drafts of the European standard prEN 16250 and the German preliminary standard DIN SPEC 1108 are intended to establish a uniform definition of corresponding services and their (minimum) service levels. Their binding application in practice requires that systematic inspections be provided to ascertain to what degree a service has been carried out as agreed upon. However, both standardisation projects give only a few examples of potential quality characteristics and offer no concrete information concerning methods of measurement. Because intersectoral or cross-service quality inspections do not exist, there is a need for the development of specific quality inspections. The study introduced in this article examines the question of how the service quality of door-to-door waste collection can be systematically measured. To this end, the quality concept applied to the process of waste collection was first concretised and then operationalised using indicators. Based upon this, the methods of the quality inspections were developed and subjected to a trial of their applicability in a German waste management company. The methods for measuring and evaluating take into account, in addition to the different boundary conditions of collection, also the possible customer influence on the collection process and consequently on the service performed by the collection crew. In order to avoid time- and therefore cost-intensive exhaustive surveys, a multilevel random-controlled selection of survey units was developed, too. Based on the analysis of the measurement data, it was possible to determine specific time requirement values for the regular performance of the data surveys, as well as minimum sample sizes as a function of the number of container locations of the waste collection tours. On the basis of this information, it has been possible to make initial statements concerning the personnel requirement for quality inspections. Moreover, it is possible to make recommendations concerning the daily working-time schedule for a quality manager in order to achieve the most efficient performance of quality inspections possible.

Full text links

We have located links that may give you full text access.
Can't access the paper?
Try logging in through your university/institutional subscription. For a smoother one-click institutional access experience, please use our mobile app.

Related Resources

For the best experience, use the Read mobile app

Mobile app image

Get seemless 1-tap access through your institution/university

For the best experience, use the Read mobile app

All material on this website is protected by copyright, Copyright © 1994-2024 by WebMD LLC.
This website also contains material copyrighted by 3rd parties.

By using this service, you agree to our terms of use and privacy policy.

Your Privacy Choices Toggle icon

You can now claim free CME credits for this literature searchClaim now

Get seemless 1-tap access through your institution/university

For the best experience, use the Read mobile app